Experts on land and water

HomeContact(800) 668-3220

Superfund Cleanup of New Bedford Harbor

US Army COE - New Bedford, MA


The New Bedford Harbor Superfund Project has been actively underway for a period of ten years. CLE has been awarded several contracts for construction period services and hydrographic survey services as part of the overall phased contract for the removal of highly contaminated dredge spoils by the New England District of the Army Corp of Engineers. As dredge tolerances required exact positioning, CLE Engineering was also contracted to provide highly precise positioning systems and exact stake out of dredge areas. CLE’s personnel, all trained in Superfund site procedures, provided hydrographic surveys, dredge consulting as well as assistance in the mechanical engineering of the cutter head hood for the control of turbidity during dredging