Mega Yacht Facility

Quonset Development Corporation - North Kingstown, RI


Bulkheading, Pier, 200 ton Travel Lift Design

As part of Quonset Development Corporation’s Marine facility development, CLE Engineering performed a conditions assessment for the design of the 2000 tonne Synchro Lift, 200 ton travel lift, and is designing a new bulkhead to accommodate dredging to –18 feet MLW. Also included in the project is upgrading the site drainage, and preparing an extensive dredging program. CLE is performing borings to classify the soil conditions, CLE assessing the steel bulkhead system and tie backs, and planning for other marine development of the site. CLE’s expertise with waterfront engineering allowed our staff to understand the project and identify design and regulatory constraints and cost effective alternatives.