Experts on land and water

HomeContact(800) 668-3220

Bulkhead Replacement and Dredging

Sprague Energy Corporation - Providence, RI


235’ long bulkhead design

CLE designed, and obtained all local, state and federal permits for dredging and the installation of a steel sheet pile bulkhead needed to prevent undermining of shore side structures resulting from proposed berth dredging. The 235’ long bulkhead design utilized various lengths and sections of coated steel sheet piling in order to most cost effectively conform to the changes in bedding soil conditions and load characteristics that would result from the dredging of the adjacent berth oil terminal berth. CLE also provided construction management during the dredging project, including construction period services, contract administration, and hydrographic surveys.