Project Description
• The project is located in Novato, California.
• This owner for the project is the Bel Marin Keys
• Community Services District.
• Contractors scope of work shall include Levee repairs
• including earthwork, rip rap placement and levee road
• repairs; Acceleration Lane Repairs consisting of
• erosion control, site preparation, base material, testing,
• and pavement; and Moat Repairs including dewatering,
• excavation and disposal of material at BMK DMMS
• and the construction of a drainage weir.
• A mandatory pre-bid site walk is scheduled for
• August 05, 2009 at 2:00 PM starting at the District’s
• Office (4 Montego Key, Novato, CA 94949).
• Bids are due on September 09, 2009 at 2:00 PM
• Contractors will be required to post Bid, Payment,
• Performance and Warranty Bonds.
• A Notice to Proceed is anticipated on or about
• September 14, 2009 and work shall be completed on
• October 31, 2009
Bid
Documents
• CLE Engineering is the Engineer/Project Manager.
• Any and all proposals and or contracts will be by and
• between the owner and selected bidder.
• All interested parties are encouraged to contact CLE
• Engineering. All dates are approximate and should
• not be relied upon as they are subject to change. All
• interested parties are encouraged to email contact
• information to wpavao@cleengineering.com. Upon
• receipt of contact information a user name and
• password will be assigned to access documents.
|
 |